Leading Manufacturer & Exporter of
ANSI B16.5 Flanges to Egypt
Werner Flanges stands as Egypt's trusted partner for high-quality ANSI B16.5 flanges, serving the nation's thriving oil and gas, petrochemical, and industrial sectors for over two decades. As a leading manufacturer and exporter of pipe flanges compliant with ASME B16.5 standards, we supply comprehensive flange solutions to major projects across Cairo, Alexandria, Suez, Port Said, and the Suez Canal Economic Zone.
Our ANSI B16.5 flanges are engineered to meet the demanding requirements of Egypt’s expanding energy infrastructure, including natural gas processing facilities in the Mediterranean, petrochemical complexes in Alexandria and Ain Sokhna, and power generation plants across the Nile Delta. We manufacture all seven flange types—Weld Neck, Slip On, Blind, Socket Weld, Threaded, Lap Joint, and Long Weld Neck flanges—in carbon steel, stainless steel, alloy steel, duplex, and nickel alloy materials.
Every flange we supply to Egypt adheres strictly to ASME B16.5, ASTM, and API specifications, with complete material traceability and third-party inspection available from internationally recognized bodies including TÜV, DNV, Lloyd’s Register, Bureau Veritas, and SGS. Our manufacturing facility maintains ISO 9001:2015 certification and follows rigorous quality control protocols to ensure dimensional accuracy, mechanical properties, and pressure integrity for critical applications in Egypt’s industrial landscape.
With competitive pricing as a direct manufacturer, fast delivery through strategic logistics partnerships to Egyptian ports, and comprehensive technical support, Werner Flanges delivers exceptional value to engineering companies, EPC contractors, and end-users throughout Egypt. We understand the unique requirements of Egypt's industrial sectors and provide customized solutions with pressure classes ranging from 150# to 2500# and sizes from ½" to 60".
Specifications
| Specification | Details |
|---|---|
| Pressure Rating | Class 150 to Class 2500 |
| Flange Type | Plate Flange |
| Facing Type | Raised Face (RF), Flat Face (FF), Ring Type Joint (RTJ) |
| Size Range | ½” to 24” (DN 15 to DN 600) |
| Temperature Range | -29°C to +593°C (Depending on Material & Pressure Class) |
| Applications | Oil & Gas, Petrochemical, Power Generation, Water Treatment, Marine & Industrial Sectors |
| Manufacturing Process | Forged / Machined |
| Certification | EN 10204 3.1 / 3.2, IBR, NACE MR0175 / ISO 15156 (as applicable) |
Matel and Grade
| Type of Materials | Common Specifications / Customization Available on Request |
|---|---|
| Duplex Steel | ASTM/ASME A182 F51, F60, F61, UNS S31803, UNS S32205 |
| Super Duplex Steel | ASTM/ASME A182 F53, F55, UNS S32750, UNS S32760, F44 (6Mo) |
| Stainless Steel | ASTM/ASME A182 F304, F304L, F316, F316L, F310, F317L, F321, F347 |
| Carbon Steel | ASTM A105, A350 LF1, LF2, LF3, A266 Class 1/2, A694 F42 to F70, A765 Gr. II |
| Alloy Steel | ASTM/ASME A182 F1, F5, F9, F11, F12, F22 |
| Non-Ferrous Alloys | Titanium, Brass, Admiralty Brass, Copper Nickel, Nickel Alloys, Hastelloy |
| Titanium | ASTM/ASME B381 Gr.1, Gr.2, Gr.5, Gr.7, Gr.12, Gr.16 |
| Copper Nickel | ASTM B151 UNS C70600 (Cu-Ni 90/10), C71500 (Cu-Ni 70/30) |
| Brass, Al-Brass | ASTM B152 UNS C26000, C27200, C28000; ASTM B111 for Al-Brass |
| Nickel Alloys | ASTM B160, B161, B564 – UNS N02200, N02201, N04400, N08800, N08825, N06600, N06601, N06625, Monel K500 |
| Alloy 20 | ASTM B462 UNS N08020 |
| Hastelloy | ASTM B564 UNS N10276 (Hastelloy C276), N06022 (Hastelloy C22) |
| Cladded Materials | ASTM B898, B265, B424 or custom explosion/clad bonding using dissimilar metals |
| Titanium-Steel, Nickel-Steel, Titanium-Copper, Stainless Steel-Carbon Steel, Bimetallic/Trimetallic Combinations |
Types of Flanges
| Slip On Flanges | Weld Neck Flanges | Blind Flanges | Socket Weld Flanges | Threaded Flanges |
| Lap Joint Flanges | Reducing Flanges | Orifice Flanges | Long Weld Neck Flanges | Spectacle Blind Flanges |
Industries and Applications We Supply
| Industry | Applications |
|---|---|
Oil & Gas Industry |
Egypt’s oil and gas sector represents one of the Middle East’s most dynamic energy markets, with extensive upstream, midstream, and downstream operations creating massive demand for ANSI B16.5 flanges. Werner Flanges supports this critical industry with reliable, certified flange products tailored to Egyptian operating conditions and specifications.
Upstream Production Facilities: Egypt’s mature oil fields in the Gulf of Suez, Western Desert, and Sinai Peninsula continue producing with enhanced recovery techniques requiring upgraded surface facilities. Werner Flanges supplies ANSI B16.5 flanges for wellhead equipment, flow lines, test separators, and production manifolds. Carbon steel A105 flanges in Class 300 and 600 serve most applications, with duplex F51 specified for wells producing with high water cut or corrosive gas. The Mediterranean gas fields, including the massive Zohr field discovered in 2015, utilize Class 600 and 900 flanges in sizes 2″ to 24″ for high-pressure wellhead systems, subsea manifolds, and riser connections. The deepwater environment requires materials resistant to seawater corrosion—F316L stainless steel and duplex F51 are standard specifications. Werner Flanges provides complete material traceability and NACE MR0175/ISO 15156 compliance documentation for these critical applications. Enhanced oil recovery (EOR) projects inject water, polymers, or steam to improve recovery from aging fields. Water injection systems require Class 900 flanges in carbon steel or stainless steel, depending on water quality. Steam injection for heavy oil recovery in Egypt’s Western Desert fields uses high-temperature alloy steel F22 flanges rated for 540°C service with appropriate thermal cycling resistance. Midstream Processing & Transportation: Gas processing plants treating production from Egypt’s offshore Mediterranean fields employ thousands of ANSI B16.5 flanges in amine treating, dehydration, compression, and NGL extraction systems. Process conditions vary from low-pressure condensate stabilization (Class 150) to high-pressure gas compression (Class 600-900). Material selection ranges from carbon steel A105 for dry gas service to stainless steel F316L for sour amine systems and corrosive chemical injection. The West Delta Deep Marine (WDDM) project, one of Egypt’s largest gas developments, processes 1.2 billion cubic feet per day through extensive processing facilities requiring flanges in all pressure classes and materials. Werner Flanges supplied Class 300 carbon steel flanges for low-pressure separation, Class 600 F22 alloy steel for high-temperature regeneration, and F316L stainless steel for amine and glycol systems. Crude oil and gas transmission pipelines connecting production areas to coastal terminals and refineries employ Class 150 and 300 flanges in sizes 6″ to 48″. The trans-Egypt pipeline system transporting crude from Gulf of Suez to Mediterranean terminals uses predominantly Class 150 A105 flanges with RTJ facing for critical mainline connections. Werner Flanges’ fast delivery enables Egyptian pipeline contractors to maintain construction schedules for these strategic infrastructure projects. Downstream Refining: Egypt operates nine petroleum refineries with combined capacity exceeding 700,000 barrels per day, processing domestic crude and imports into gasoline, diesel, jet fuel, and petrochemical feedstocks. These refineries consume ANSI B16.5 flanges across atmospheric and vacuum distillation, catalytic reforming, hydrocracking, alkylation, and supporting utilities. The Cairo Oil Refining Company (CORC), Assiut Petroleum Refining Company, and Middle East Oil Refinery (MIDOR) in Alexandria all utilize ASME B16.5 as their flange standard. Material specifications span the complete range: A105 carbon steel for crude distillation and product piping, F11 and F22 alloy steels for high-temperature crackers and reformers, F316L stainless steel for sour water treatment and amine systems, and specialized nickel alloys for hydrofluoric acid alkylation units. Refinery modernization projects adding hydrotreaters and hydrocrackers to produce Euro-V compliant fuels require extensive high-pressure hydrogen piping with Class 600 and 900 flanges in alloy steels meeting NACE requirements for hydrogen service. Werner Flanges provides complete documentation packages including heat treatment charts, impact testing at elevated temperatures, and hydrogen embrittlement resistance certification for these critical applications. Offshore Platforms: Egypt’s Mediterranean offshore platforms face demanding marine environments combining seawater exposure with hydrocarbon processing. Platform topsides and subsea equipment require corrosion-resistant flanges—typically duplex F51 or super duplex F53—to ensure 20-30 year service life without corrosion failures. The combination of high strength and superior corrosion resistance makes duplex stainless steels ideal for weight-sensitive offshore applications. Subsea equipment including Christmas trees, flowlines, and manifolds utilize ANSI B16.5 flanges with enhanced specifications: NACE compliance, 100% ultrasonic testing, full traceability to steel mill heat, and witnessed testing by classification societies. Werner Flanges supplies these specialized flanges with complete offshore certification packages meeting Egyptian General Petroleum Corporation (EGPC) and international operator standards. |
Petrochemical & Chemical Processing |
|
Power Generation |
|
Water & Wastewater Treatment |
|
Frequently Asked Questions (FAQs)
-
- What is the typical delivery time for ANSI B16.5 flanges to Egypt?
Standard carbon steel flanges in common sizes and pressure classes (Class 150/300, NPS 2″ to 24″, A105 material) ship within 3-4 weeks from order confirmation, with sea freight transit of 18-22 days to Alexandria or Port Said ports. Total delivery time to Egyptian project sites: 5-6 weeks. For urgent requirements, air freight delivery to Cairo International Airport takes 5-7 days plus customs clearance and inland transport.
Stainless steel, alloy steel, and duplex materials may require 4-6 weeks manufacturing time depending on size and pressure class availability. Large diameter flanges (30″ to 60″) or high pressure classes (900#, 1500#, 2500#) typically need 6-8 weeks manufacturing plus shipping. We provide accurate lead times with each quotation based on current production schedules and material availability.
- Do your ANSI B16.5 flanges comply with Egyptian standards and regulations?
Yes, our ANSI B16.5 flanges fully comply with Egyptian industrial standards and regulatory requirements. Egypt widely accepts ASME/ANSI standards for oil and gas, petrochemical, power generation, and industrial applications. Our flanges meet ASME B16.5 dimensional requirements, ASTM material specifications, and API standards where applicable.
For projects requiring Egyptian Ministry of Petroleum or EGPC (Egyptian General Petroleum Corporation) approval, we provide complete documentation packages including EN 10204 3.1 material certificates, dimensional inspection reports, and third-party inspection certificates from internationally recognized bodies. All documentation is prepared in English and accepted by Egyptian authorities and project specifications.
- Can you supply flanges with third-party inspection for Egyptian oil and gas projects?
Absolutely. Werner Flanges welcomes third-party inspection from any internationally recognized inspection agency including TÜV SÜD, TÜV Rheinland, DNV GL, Lloyd’s Register, Bureau Veritas, SGS, and Intertek. Egyptian oil and gas operators commonly require third-party inspection for critical applications and pressure equipment.
Inspection services can include: witnessed material verification, dimensional inspection, mechanical testing observation, non-destructive testing witnessing, heat treatment monitoring, final inspection, and certification. We coordinate directly with your specified inspection agency, provide access to manufacturing facilities and quality records, and include inspection costs in our quotations when requested.
Third-party inspection reports provide independent verification of compliance with purchase order specifications and Egyptian project requirements, particularly valuable for NACE compliance, sour service applications, and critical high-pressure systems.
- What materials do you recommend for seawater applications in Egyptian coastal facilities?
For seawater service in Egyptian coastal facilities including desalination plants, offshore platforms, and power plant cooling systems, we recommend the following materials based on service conditions:
Duplex Stainless Steel F51 (UNS S31803): Excellent choice for ambient temperature seawater with twice the strength of austenitic stainless steel. Provides superior pitting and crevice corrosion resistance while enabling thinner, lighter construction. Suitable for temperatures up to 250°C.
Super Duplex F53/F55 (UNS S32750/S32760): Highest corrosion resistance for hot seawater, high-velocity conditions, or aggressive marine environments. Essential for critical offshore equipment and high-pressure seawater injection systems where failure would be catastrophic.
Stainless Steel 316L (UNS S31603): Acceptable for low-chloride brackish water or freshwater service but not recommended for full-strength seawater due to chloride-induced stress corrosion cracking risk. Can be used with cathodic protection systems.
The choice depends on temperature, velocity, chloride concentration, and criticality of application. Our application engineers can review your specific Egyptian coastal facility requirements and recommend optimal materials considering performance, lifecycle cost, and risk factors.
- Do you provide NACE MR0175/ISO 15156 compliant flanges for sour gas service?
Yes, Werner Flanges manufactures NACE MR0175/ISO 15156 compliant flanges for sour gas service in Egyptian oil and gas facilities handling H2S-containing environments. Compliance requires careful material selection, chemistry control, hardness testing, and documentation.
For carbon and low-alloy steels, we verify maximum hardness of 22 HRC (Rockwell C) or 248 HB (Brinell) to prevent sulfide stress cracking. Material chemistry is confirmed within NACE limits for elements affecting SSC resistance. All flanges undergo 100% hardness testing with documented results.
Stainless steels and nickel alloys require specific composition ranges and heat treatment to achieve proper microstructure for sour service resistance. We provide complete NACE compliance documentation including material certificates showing chemistry compliance, hardness test results, heat treatment verification, and material manufacturer’s NACE conformance statements.
For critical Egyptian sour gas applications, we recommend third-party verification of NACE compliance and can arrange SSC testing per NACE TM0177 if specified by project engineering standards.
- What is your minimum order quantity and can you handle small urgent orders?
Werner Flanges accommodates orders of all sizes from single pieces for emergency repairs to thousands of flanges for major Egyptian projects. We have no strict minimum order quantity, though small orders may incur higher per-piece costs due to setup and handling expenses.
For urgent small quantities (1-20 pieces), we maintain inventory of common sizes in carbon steel A105 (Class 150/300, NPS 2″ to 12″) and stainless steel F316L enabling same-day or next-day shipment. Air freight delivery to Cairo reaches Egypt in 5-7 days for emergency requirements preventing costly downtime at Egyptian refineries, chemical plants, or production facilities.
Large project orders (100+ pieces) receive volume discounts and can be scheduled for phased delivery matching Egyptian construction timelines. We work with project schedules to deliver materials just-in-time, reducing on-site storage requirements and working capital tied up in inventory.
- Can you manufacture custom flanges to non-standard dimensions?
Yes, our engineering and manufacturing capabilities enable custom flange production for special Egyptian applications requiring non-standard dimensions. Common custom requirements include:
- Special bore diameters matching proprietary equipment
- Non-standard thickness for specific pressure or corrosion allowances
- Custom bolt patterns for existing equipment replacement
- Special facing configurations (custom RTJ grooves, tongue-and-groove)
- Combination materials (carbon steel backing with stainless overlay)
Custom manufacturing requires engineering drawings or detailed specifications including all critical dimensions, tolerances, material requirements, and testing specifications. Our engineering team reviews custom requirements, confirms manufacturing feasibility, and provides quotations including tooling costs if special dies or fixtures are needed.
Lead time for custom flanges is typically 6-8 weeks depending on complexity and material availability. Complete documentation is provided including custom dimension inspection reports verifying compliance with customer-specified requirements.
- What payment terms do you offer for Egyptian customers?
Werner Flanges offers flexible payment terms accommodating Egyptian customers’ preferences and banking regulations:
Letter of Credit (L/C): Sight L/C or usance L/C through Egyptian banks. We accept L/Cs confirmed by international banks ensuring payment security for both parties.
Advance Payment: 100% advance payment via wire transfer with 2-5% discount depending on order value. This option provides fastest order processing and manufacturing priority.
Partial Advance Payment: 30-50% advance with balance against shipping documents or before delivery. Common for established Egyptian customers with proven payment track record.
Standard Payment Terms: Net 30-60 days for regular customers with good credit history and ongoing business relationships. Requires commercial references and credit evaluation.
All payments can be made in US Dollars (USD), Euros (EUR), or agreed currency. We work within Egyptian foreign exchange regulations and can coordinate with Egyptian banks for smooth payment processing. Banking details and payment instructions are provided with quotations and sales confirmations.
GET A QUOTE
- Werner Flanges welcomes inquiries from Egyptian customers for ANSI B16.5 flanges across all specifications, materials, and quantities. Our experienced sales team provides detailed quotations within 2-4 business hours of receiving your requirements.To request a quote, please provide:
Basic Specifications:
- Flange Type (Weld Neck, Slip On, Blind, Socket Weld, Threaded, Lap Joint)
- Size Range (NPS 1/2″ to 60″)
- Pressure Class (150#, 300#, 600#, 900#, 1500#, 2500#)
- Material Grade (A105, F304L, F316L, F51, etc.)
- Quantity Required
- Facing Type (RF, FF, RTJ)
Project Details:
- Project Name and Location in Egypt
- End User / Final Destination
- Delivery Schedule Requirements
- Payment Terms Preference
Special Requirements:
- Third-Party Inspection (specify agency)
- Special Testing (impact testing, PMI, extended NDT)
- Special Coatings or Surface Treatment
- Custom Dimensions or Specifications
- Documentation Requirements beyond standard package
Contact Information:
- Company Name and Contact Person
- Email Address
- Phone Number / WhatsApp
- Physical Address in Egypt
Response Commitment:
Our sales team reviews all inquiries promptly and provides comprehensive quotations including:
- Itemized pricing by size, class, and material
- Total project value with volume discounts applied
- Manufacturing lead time (typically 3-6 weeks depending on specifications)
- Shipping options (sea freight and air freight) with delivery times
- Payment terms and conditions
- Validity period of quotation
For urgent requirements or large-scale Egyptian projects, we can schedule video conferences to discuss technical specifications, application requirements, and commercial terms directly with your engineering and procurement teams.
Contact Werner Flanges:
Email: sales@wernerflanges.com




